Ongoing City of London Project 33KV inc service connections 

London Jointing 33KV

  

This consists of the jointing of the newly installed 33KV network in the City of London.  We are currently working with LPN Primary engineers configuring this into the existing 33KV system and connecting the new major sites, Broadgate and Mark Lane being the latest connections. This project also included Pilot and Fibre jointing which we completed.