Fakenham 33KV

This project was to carry out the testing, jointing and termination of a double 400mm2 33KV circuit and a fibre optic circuit.  This project was undertaken by ESM Power Ltd who engaged D&R to carry out the testing and jointing works.  D&R carried out all the jointing and testing work on this project and in addition to this completed all the terminations at the POC end which included switchgear terminations and transformer terminations.